How much does is cost to operate a dredge?
January 14, 2022
Dredging is highly variable in cost. Cost involved for dredging projects are typically as follows:
- Permitting – local, state, and federal are considered in most projects
- Planning – designing engineered plans usually for the dewatering area and disposal
- Mobilization – both of the equipment, the setup for dewatering, and disposal site
- Depth of Sediment – water and sediment depth determine much of the cost involved (i.e. shallow sediment depth takes much more time to dredge)
- Type of Sediment – texture of the sediment determines the type of dredge and dewatering process; debris can add to cost significantly
- Run-times – 24/7 or 5 days for 8 hours; weather is also a major factor depending on the project
- Export and Transport – the time for the dewatering (immediate vs. months) and distance to the disposal area
- Disposal – the setup of the disposal area and final reclamation; or the tip-fee for a landfill
- Remediation – clean-up of the project site and installation of best management practices
Costs to operate the dredge include wear parts, labor, fuel, and maintenance. Dredges are unique in that break-downs and maintenance usually have to occur on the water so adequate support personnel and equipment must be available. All of these factors is why dredging cost range from a $3 to $300 per cubic yard. Dredging is often limited by other factors such as dewatering or disposal, so costs can be affected by the entire process as well.